Structural Engineering Mauss

Structural Engineering Mauss

Steel structure · Plant construction

Structural analysis · Project management

Scaffolding, Formwork

Safescreen, Hochhaus Grandtower

Project
Windscreen "Safescreen"

Client
Hünnebeck GmbH​

Service
Structural Analysis for Basic and Detail Design​

Description
In order to speed up the construction progress and increase occupational safety, self-climbing windscreens, so-called "safescreens", are used. The windshields are in turn anchored to the shell by "balcony supports": The windshields enclose the entire façade and cover four floors

Erweiterung Moschee Mekka

Project
Extension of Mosque of Mecca, Saudi Arabia (Mataf Extension)​

Client
GHI Formworks LLC, Dubai / Saudi Bin Ladin Group (SBG)​

Year
2014, 2015​

Service
Basic and Detail Design, Erection Planning

Description
An additional floor is build around the main sanctuary of the Kaaba (Mataf Extension). It consists of floors spanning 15 m and main concrete beams with cross section 2,2m / 3, 6m. To allow the use of the areas below the new floor during construction, wide-span steel girders instead of conventional scaffolding are used to support wet concrete weight during concrete casting. Aside from design of steel girders, further focus was put on erection planning and design changes during construction which were carried out under high time pressure.​ https://shorturl.at/yaJ7D

Erweiterung Moschee Medina

Project
Extension of Mosque of Medina, Saudi Arabia (Medina Haram Expansion)

Client
GHI Formworks LLC, Dubai / Saudi Bin Ladin Group​

Service
Basic and Detail Design, Erection Planning

Description
Mosque of Medina is enlarged by three-floor prayer cells with a base area of 5.500 m² and a total height of 50 m. Present project consists of the temporary steel construction used for carrying wet concrete load and serving as an construction platform. Steel construction is designed as a spatial framework with dimensions 24m x24m. Weight is approx. 1000 ton.​

Temporäres Dach über Mosche Mekka

Project
Temporary ceiling above Mosque of Mecca, bidding phase

Client
GHI Formwork LLC, Dubai​

Service
Design, Assembly Planning and Visualisation for Proposal Presentation​

Description
Design for temporary roof during tender phase for reconstruction and extension of the mosque in Mecca. A spatial steel framework with a span of 140 m was designed. Total area of 65.000 m² and a steel construction weight of 5000 t.